Concrete Leveling

Epoxy floor finishing in a gallery detail shot

Level any floor with True’s concrete leveling and pumping system. We’ve helped our customers level and overlay over a million square feet of concrete floors in Colorado. If your floor is unlevel, we definitely need to talk.

Floor Leveling

Fix unlevel floors fast with concrete leveling.

True Finishing has the ability to pump self-leveling material at a rate of 7500 sq ft per hour using the CUBE Pumping System. We can level large areas in a matter of hours which can be accelerate construction schedules.

About Floor Leveling at True Finishing

How it Works

The Benefits

How to Level an Unlevel Floor

True Finishing specializes in self leveling floors. We are certified by Ardex as a Preferred Partner installing self leveling underpayments’ using various Ardex products. This material can be used as an underlayment for carpet, tile and wood flooring or can be used for a decorative “concrete” look. Most Ardex products are designed for use over concrete, metal, terrazzo, ceramic tile, wood and non-water-soluble old flooring adhesive residue (including cutback) on, above or below grade.

Ardex products are pourable or pump-able and installs from featheredge to 1.5-inch in one application up to 5-inches with the addition of proper aggregate. Design specifically for fast leveling of floors, Ardex provides a durable, flat and smooth floor surface with minimum labor and installation time.

Ardex hardens quickly by hydration and drying. It will not shrink, crack or spall, even when applied in thick layers. Floor coverings can be installed just 16 hours later.

The Benefits of Leveling Floors

The benefits of correctly leveling floors is that it avoids spending hours on renovation when a job gone wrong with finishings happens. Be sure your floors are correctly leveled before starting floor finishings. Here are the specific benefits of choosing True Finishing as your next floor leveling partner.

  • Portland cement based
  • High strength: 4100 psi
  • Installs up to 5 in. thick
  • Designed specifically for fast leveling of floors
  • Walk-able in 2-3 hours
  • Install floor covering after 16 hours

Floor Leveling FAQ’s

Common questions asked when leveling floors.

When will the floors be walkable after they are leveled?

Most jobs take 2-3 hours before they are walkable. For specifics, contact us for services.

How long after the floors are leveled can I add finishings?

We tell our clients they can begin adding finishings and floor covering after 16 hours.

View All Case Studies

2290 S Lipan St
Denver, CO 80223

EMAIL
info@truefinishing.com

We’re here to make sure your next Floor Preparation, Floor Restoration, and Floor Finishing jobs go perfectly. Rely on True to be your one-stop shop on all your flooring needs.

"*" indicates required fields

Name*
Email*
Please let us know what's on your mind. Have a question for us? Ask away.