Total Square Footage
6,700+
Project Status
Completed
Project Overview
Major floor restoration leads to gorgeous results with dynamic microtoppings.
The client needed extensive work completed, including wax removal, polishing, staining, and staircase refinishing, all within an extremely tight 7-day window. Time was the largest challenge. True Finishing rose to the occasion by running double shifts and prioritizing high-traffic areas first. This allowed us to complete key sections of the space before the one-week deadline, delivering a flawless finish on time.
Services Completed
The Challenge
Tight timeline and tough conditions.
Request for Service
This was a highly challenging project due to a tight 7-day timeframe. The existing floor had accumulated over 200 layers of wax, which required complete removal before polishing. With stained joints and other complex elements, completing everything within one week seemed impossible. However, through careful planning and strategic sectioning, we tackled the task head-on. Our team also installed a new Micro-Topping on two large staircases and replaced the entire rubber wall base in the area.
Solutions that Delivered Stunning Results
Faced with the time constraints, our team of experts ran double shifts, strategically completing sections before the facility’s shutdown. By doing so, we ensured the space was fully transformed within the deadline. The results were stunning: polished and stained concrete floors, refreshed staircases with micro-topping and new stair treads, all enhanced by sleek new rubber wall base.
Additional Services Provided:
- Wax Removal
- Concrete Staining
- Rubber Wall Base Replacement
Floors that Shine
★★★★★
“True transformed the space and under a very tight deadline.”
Highlands Ranch Recreation Center